WD&CD Long Lead-Training Leash for Pets, 10 Meters Training Leads for Dogs/Puppy Training,Play,Camping,Extra Long Dog Leash – Black

Original price was: $20.39.Current price is: $17.51.

Clear

Description
  • 【Size】: Dog Training Leads, black and red, 2 sizes 6 meter and 10 meter, Width 2cm.
  • 【with Comfortable Padded Handle】: The dog training leash with a comfortable padded handle, which is comfortable while dogs pulling and protects your hand from rope burn.
  • 【Material】: Gog training lead is made of strong nylon with durable metal Buckle and a velcro.
  • 【Widely Use】: Dog Training Leads is suitable for many pets, such as dogs, cats, teddy, chihuahua, pomeranian, golden retriever, husky, alaskaand other breeds.
  • 【Swivel-Style Stainless Steel Buckle】: The dog leash equipped with a rotatable durable metal Buckle for easy attachment to the dog’s collar, rotate 360 degrees.

Long Lead-Training Leash for Pets, Long Training Leads for Dogs/Puppy Training,Play,Camping,Extra Long Dog Leash

Additional information
Weight0.19 kg
Dimensions17.7 × 15.5 × 3.7 cm
Size Name

10 M, 6 M

Colour Name

Red, Black